·

Part of the process

Loading the barrel

Fill the barrel between half and three quarters full with a mix of sizes, add about two level tablespoons of grit per pound of rock, and bring the water to just below the top layer.

A barrel tumbles properly only when it is between half and three quarters full; about two thirds is the usual target. Emptier than half and the stones are thrown against each other and chip. Fuller than three quarters and they cannot fall, so nothing grinds.

Grit is measured against the weight of rock: about 2 level tablespoons per pound in a rotary tumbler, the same in every grit step. Water goes in last, up to just below the top layer of stones. The grit calculator does the arithmetic for your barrel.

If you do not have enough rock to reach the fill line, top the load up with ceramic media. Plastic pellets do a different job: they cushion fragile stones. Count either one as rock when you measure the grit.

Common mistakes at this stage

  • Running a barrel that is under half full.
  • Covering the rocks with water, which floats the grit away from them.
  • Reusing plastic pellets from a coarser step in a finer one.

Notes for this stage

Gear for this stage